<p>Today we skated the Iron Horse Trail section that extends from Rudgear road to Monument Boulevard and back. (See a complete write up of Iron Horse Regional Trail North on <a href="http://www.caskating.com/tour/305">CASkating.com</a>.) We started near the upgraded staging area at Rudgear, with its benches and a water  fountain, completed in late 2009.  Lots of happy trail users were out enjoying the beautiful morning in Walnut Creek.</p>
<p>On this northern portion of the Iron Horse, the surface is generally in good condition except for one section alongside Walnut Creek which continues to degrade. The wash-boarding is bad enough to knock a skater down or to throw a bicyclist off her bike. It’s about time the city or the park district did something about this growing hazard.</p>
<p>The biggest change now is near the Pleasant Hill BART station, where a beautiful new pedestrian bridge has been built over Treat Boulevard.</p>
<div style="width: 410px" class="wp-caption aligncenter"><img loading="lazy" decoding="async" style="display: block;" title="New bridge under construction in Walnut Creek CA" src="https://getrolling.com/blog/wp-content/uploads/2010/08/wpid-2010-08-08-12.12.56.jpg" alt="image" width="400" height="302" /><p class="wp-caption-text">New bridge under construction in Walnut Creek CA</p></div>
<p>The Trail near the BART station is smooth and nicely landscaped. The  new apartments nearby are a welcome addition to the area. It  is nice to see smart urban infill in action.</p>
<p>When this post was originally written, skaters had to watch for a path just north of the  bridge construction where a 90-degree turn to the right returned to the regular trail. Because the turn wasn&#8217;t well signed, Dan went straight and rolled off onto a gravel path. Fortunately, no mishaps or road rash resulted from that! And now, of course, the bridge is in use, making the detour unnecessary.</p>
<p>Enjoy your skating on the Iron Horse &#8211; we are!</p>
{"id":255,"date":"2010-08-08T18:43:56","date_gmt":"2010-08-09T01:43:56","guid":{"rendered":"http:\/\/getrolling.com\/blog\/?p=255"},"modified":"2021-01-07T12:45:53","modified_gmt":"2021-01-07T19:45:53","slug":"northern-iron-horse-trail-update","status":"publish","type":"post","link":"https:\/\/getrolling.com\/blog\/2010\/08\/08\/northern-iron-horse-trail-update\/","title":{"rendered":"Northern Iron Horse Trail Update"},"content":{"rendered":"<p>Today we skated the Iron Horse Trail section that extends from Rudgear road to Monument Boulevard and back. (See a complete write up of Iron Horse Regional Trail North on <a href=\"http:\/\/www.caskating.com\/tour\/305\">CASkating.com<\/a>.) We started near the upgraded staging area at Rudgear, with its benches and a water  fountain, completed in late 2009.  Lots of happy trail users were out enjoying the beautiful morning in Walnut Creek.<\/p>\n<p>On this northern portion of the Iron Horse, the surface is generally in good condition except for one section alongside Walnut Creek which continues to degrade. The wash-boarding is bad enough to knock a skater down or to throw a bicyclist off her bike. It\u2019s about time the city or the park district did something about this growing hazard.<\/p>\n<p>The biggest change now is near the Pleasant Hill BART station, where a beautiful new pedestrian bridge has been built over Treat Boulevard.<\/p>\n<div style=\"width: 410px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" style=\"display: block;\" title=\"New bridge under construction in Walnut Creek CA\" src=\"https:\/\/getrolling.com\/blog\/wp-content\/uploads\/2010\/08\/wpid-2010-08-08-12.12.56.jpg\" alt=\"image\" width=\"400\" height=\"302\" \/><p class=\"wp-caption-text\">New bridge under construction in Walnut Creek CA<\/p><\/div>\n<p>The Trail near the BART station is smooth and nicely landscaped. The  new apartments nearby are a welcome addition to the area. It  is nice to see smart urban infill in action.<\/p>\n<p>When this post was originally written, skaters had to watch for a path just north of the  bridge construction where a 90-degree turn to the right returned to the regular trail. Because the turn wasn&#8217;t well signed, Dan went straight and rolled off onto a gravel path. Fortunately, no mishaps or road rash resulted from that! And now, of course, the bridge is in use, making the detour unnecessary.<\/p>\n<p>Enjoy your skating on the Iron Horse &#8211; we are!<\/p>\n","protected":false},"excerpt":{"rendered":null,"protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-255","post","type-post","status-publish","format-standard","hentry","category-skating"],"_links":{"self":[{"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/posts\/255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/comments?post=255"}],"version-history":[{"count":9,"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/posts\/255\/revisions"}],"predecessor-version":[{"id":262,"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/posts\/255\/revisions\/262"}],"wp:attachment":[{"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/media?parent=255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/categories?post=255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/getrolling.com\/blog\/wp-json\/wp\/v2\/tags?post=255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}